Client: Tumas
Works Carried Out: The project involved several alterations to the existing hotel and the construction of a 5 storey extension within a period of 3 months. At the same time excavation of a 3500m2 car park was performed following which it was constructed over 4 stories using prestressed beams and predalles produced at the Elbros PPB factory.
Duration of Works: 3 months
Year: 2016
Photo credit: http://www.dolmen.com.mt/en/gallery.html