Works Carried Out: The project consisted of the demolition of existing dwellings, relocation of the top soil and the excavation of approximately 30,000m³ in rock.
Two stories of garages were constructed over an area of 3500m² and also the construction of 150 apartments over 8 floors covering an area of 17,000m².
Duration: 30 months
Completed: September 2017